← All Projects

Full Redecoration of Lounge in Surbiton

A comprehensive lounge redecoration addressing multiple structural issues. The original plaster coving required extensive repairs, saving the client the cost of having it ripped down and replaced. Significant wall cracking was cut out, double filled, and sealed accordingly. All original woodwork was washed, sanded, and filled. The sash windows received epoxy filler on every joint to guarantee they would never open up again. Walls were relined with wallrock reinforcement before final finishes. The ceiling and woodwork were spray finished for a smooth, even result, while walls were completed using traditional rolling and brushing methods.

Before and After

Full Redecoration of Lounge in Surbiton, after After
Full Redecoration of Lounge in Surbiton, before Before

How the Project Progressed

  1. Lounge redecoration project, photo 1
  2. Lounge redecoration project, photo 2
  3. Lounge redecoration project, photo 3
  4. Lounge redecoration project, photo 4
  5. Lounge redecoration project, photo 5

Project Photos